| Location: Fairview Heights, IL |
Project Details: This single family home was damaged by a fire on the second floor that required our crew to remove the entire second floor and to start new. The restoration included the reconstruction of the second floor, structural framing repair, structural electrical, plumbing, and HVAC as well as all new interior finishes throughout. |
| Client: Dase Family |
| Date Complete: '04 |
|
|